A call-off from Lot A of the Place, Connectivity & Infrastructure Professional Services Framework 2022-2026 (Published 4 March 2022). To provide additional resource to enable Hampshire County Council's structures team to complete the design of a bridge over the River Hamble to carry the proposed Botley Bypass. This is a continuity direct award following PCI_LotA_158.
- Engineering services
- United Kingdom
- South East England