National Nuclear Laboratory (NNL) intends on establishing a DPS route to market for the Operations, Site Work and Facilities Management requirement, across 8 Lots. Site Preparation Building and Facility Construction and Maintenance Services Industrial Production and Manufacturing Services Heating, Ventilation and Air Conditioning Mechanical and Electrical, Control and Instrumentation Hazardous ...
- Electrical machinery, apparatus, equipment and consumables; lighting
- Loadbearing equipment
- Laboratory, optical and precision equipments (excl. glasses)
- Laboratory furniture
- Industrial machinery
- Lifting and handling equipment
- Lifts, skip hoists, hoists, escalators and moving walkways
- HVAC packages
- Miscellaneous general and special-purpose machinery
- Construction structures and materials; auxiliary products to construction (except electric apparatus)
- Modular and portable buildings
- Scaffolding
- Construction work
- Works for complete or part construction and civil engineering work
- Building construction work
- Waste disposal site construction work
- Electrical installation work of heating and other electrical building-equipment
- Electrical engineering installation works
- Mechanical installations
- Repair and maintenance services
- Repair and maintenance services of electrical and mechanical building installations
- Installation services (except software)
- Installation services of laboratory equipment
- Architectural, construction, engineering and inspection services
- Engineering services
- Heating engineering services for buildings
- Building surveying services
- Engineering design services
- Heating-system design services
- Mechanical and electrical engineering services
- Waste analysis services
- Refuse disposal and treatment
- Radioactive-, toxic-, medical- and hazardous waste services
- United Kingdom
- North East England
- North West England
- Yorkshire and the Humber
- East Midlands
- West Midlands
- East of England
- London
- South East England
- South West England
- Wales
- Scotland